Regulatory
EU GMP Annex 1: what it means for technical systems
EU GMP Annex 1 and technical systems: what the revised version means for cleanrooms, HVAC, monitoring, utilities and barrier systems, with a gap analysis.
· 8 min read
Cleanliness is a state. Without evidence, it remains a claim.
Service 03
Joining running projects, Annex 1 gap analyses and audit preparation. At the end you know where you stand and what to do next.
What it is about
We are often brought in when the design work is already under way. Construction, installation and qualification overlap, and documents exist in different revisions. We check the existing requirements against your SOPs, the design documents and the requirements of the EU GMP Guide and 21 CFR Part 211. That includes a look at actual use, which quite often differs from what the documents say. You receive a findings list with three clear categories: met, conflict, not evidenced. Every action is prioritised and has an owner.
Every gap is evidenced and rated by risk. No general remarks without a reference.
Every recommendation is tied to a document, a system or an owner.
We translate between technical design and regulatory expectations.
Approach
Agree on the reason, scope and assessment criteria.
Review documents, walk through the facility, talk to engineering, users and QA.
Check every requirement against design and actual status and rate it.
Hand over prioritised actions with owners and sequence.
Review
Design, BoQ, drawings, customer SOPs
Comparison
Requirements against GMP expectations
Walk-through
Documents against actual use
Findings list
met, conflict, not evidenced
Questions
Yes, that is actually the most common case. We start with the existing documents and the current design status. What already works stays as it is.
We cover CSV and GAMP 5 at advisory level: classification, categorisation, documentation scope, requirements from Annex 11 and 21 CFR Part 11 and the interfaces to equipment qualification. For extensive software validation we recommend specialist partners.
Yes, for example before a new build, before extending a system or after a regulation such as Annex 1 has been revised.
No. We provide technical GMP consulting. Responsibility for regulatory decisions stays with your organisation.
Insights
Regulatory
EU GMP Annex 1 and technical systems: what the revised version means for cleanrooms, HVAC, monitoring, utilities and barrier systems, with a gap analysis.
· 8 min read
Audit
Audit preparation for technical GMP projects: document map, URS to qualification, CAPA, calibration, maintenance and walkthrough, with a checklist.
· 7 min read
Documentation
Common errors in GMP documentation: why they stand out in audits and how to set up requirements, traceability, approvals and raw data properly.
· 7 min read
Contact
You will get a personal reply with a first assessment of scope and approach.