Skip to content

Cleanliness is a state. Without evidence, it remains a claim.

X-Mon Germany GmbH

GMP qualification · Pharma · Medical devices

Qualification that holds up in an audit.

We plan and document the qualification of cleanrooms, HVAC systems, compressed air and pharmaceutical water. Since 2013, for pharma, medical devices and GMP laboratories in Germany, Austria and Switzerland.

Our principle

Cleanliness is a state.
Without evidence, it remains a claim.

That is why we back every requirement with a test step, a measured value and a signature. What is in the room book shows up in the protocol, and what is in the protocol can be shown in an audit.

Services

From qualification plan to approval.

Three services that work together. We add calibration where measured values feed into qualification.

01

Qualification

DQ, IQ, OQ and PQ for cleanrooms, HVAC systems, compressed air, pharmaceutical water and process equipment. We derive the test scope from the risk assessment.

02

GMP documentation

Qualification master plan, risk assessment, URS, room book, test plans and SOPs. Every requirement can be traced to its evidence.

03

GMP consulting

Joining running projects, Annex 1 gap analyses and audit preparation. At the end you know where you stand and what to do next.

Additionally: Calibration & measurement for quality-relevant instruments and sensors, with traceable references.

How we work

First the plan, then the risk, then the requirement.

Under Annex 15, the scope and depth of qualification follow a documented risk assessment, and ICH Q9(R1) provides the methodology. That is why we put into the URS what affects product quality and patient safety. Everything else we test in the technical acceptance.

  1. 01

    QMP

    Define objects, interfaces and scope

  2. 02

    Risk assessment

    shows what is critical for product and patient

  3. 03

    URS

    GMP-relevant requirements only

  4. 04

    DQ

    User requirements against supplier specification

  5. 05

    IQ · OQ · PQ

    Expected against actual, with evidence

  6. 06

    Approval

    Report, then requalification

DQ as a comparison

The user requirements describe what you need. The supplier specification describes how the supplier will deliver it. The DQ checks whether the two match.

Room book as the basis

For rooms, the room book holds the quality-relevant data. It is the basis for the DQ and leads to the air volume schedule and the ventilation schematic.

Clear interfaces

We define in the qualification plan where the room ends and the HVAC system begins. In the OQ both come together, and every test appears exactly once in the right protocol.

Systems

What we qualify.

Our focus is the technical infrastructure: everything that affects product quality through rooms, air, water and utilities.

  • Cleanrooms

    Grades A to D to Annex 1 or ISO classes to ISO 14644-1, room book as the basis for the DQ, room OQ for airlocks and interlocks.

  • HVAC systems

    Air volumes, pressure cascade, airflow direction, filter integrity, temperature and humidity.

  • Compressed air and gases

    Purity to ISO 8573-1 at points of use with product contact.

  • Pharmaceutical water

    Purified Water and WFI to Ph. Eur.: generation, storage and distribution.

  • Storage areas and cold rooms

    Temperature and humidity mapping of warehouses, cold and freezer rooms, refrigerators and climatic chambers.

  • Process equipment

    Equipment with product contact, instrumentation, alarms and safety functions.

  • Laboratory areas

    Rooms, ventilation, fume hoods and utilities in GMP-regulated laboratories.

Test depth based on risk.

How deeply we qualify depends on the cleanroom grade and the impact on the product. Our initial proposal is confirmed in the project by a risk assessment and agreed with your QA.

  1. Grade A / B

    Aseptic areas

    Full scope from DQ to PQ for room and HVAC system, with airflow visualisation, recovery time and microbiological tests to Annex 1.

  2. Grade C / D

    Classified areas

    Classification and qualification of room and HVAC system. The test depth for individual room functions follows the risk assessment.

  3. CNC

    Controlled not classified

    Tested where the risk assessment shows an impact on the product, for example temperature in a store. Otherwise technical acceptance and complete documentation are sufficient.

Running projects

Your project is already under way? We join where you are.

In practice, design, construction and qualification run in parallel. We check the current status against your SOPs and GMP requirements and look at how the facility is actually used. Documents and reality do not always match.

  1. 01

    Review

    Design, BoQ, drawings, customer SOPs

  2. 02

    Comparison

    Requirements against GMP expectations

  3. 03

    Walk-through

    Documents against actual use

  4. 04

    Findings list

    met, conflict, not evidenced

More about GMP consulting

Sample documents

What our documents look like.

Unique IDs, acceptance criteria before testing, approval fields and consistent references. All examples are fictitious samples.

  • URS – requirements matrix Sample
  • Traceability matrix Sample
  • OQ test protocol Sample

All documents shown are fictitious samples in the X-Mon document design. They show layout and structure and contain no customer data and no extracts from regulations. Click to enlarge.

Industries

For companies where evidence matters.

  • Pharma

    Medicinal product manufacturers with cleanrooms, HVAC systems, pharmaceutical water and process equipment.

  • Medical devices

    Medical device manufacturers with controlled production environments.

  • GMP laboratories

    QC and testing laboratories in GMP-regulated environments.

Projects

Typical assignments, without names.

For reasons of confidentiality we do not name clients. The project types show what we are regularly commissioned to do.

Project type 01 anonymised

GMP documentation for a new build

New GMP-relevant building section with cleanroom areas, HVAC and utilities. Several trades, each supplier with its own documentation status.

  • QMP
  • Risk assessment
  • URS
  • Traceability

Project type 02 anonymised

Qualification of a cleanroom area

Newly built cleanroom area that had to be qualified before production started.

  • Cleanroom
  • Room book
  • DQ
  • IQ
  • OQ
  • PQ

Project type 03 anonymised

Annex 1 gap analysis

Existing manufacturing areas were to be assessed against the requirements of the revised EU GMP Annex 1.

  • Annex 1
  • Gap analysis
  • CCS

Project type 04 anonymised

Extension of compressed air and HVAC systems

Extension of existing compressed air and ventilation systems affecting GMP-relevant areas.

  • Compressed air
  • HVAC
  • Change control
Project examples in detail

Insights

Articles from practice.

On master plans, risk assessment and URS, on DQ to PQ, room books, Annex 1 and audit preparation.

Qualification

The room book as the basis of room qualification

What belongs in a room book, how it leads to the air volume schedule, and where the qualification interface between the room and the HVAC system lies.

· 8 min read

All articles

Contact

Tell us briefly about your project.

You will get a personal reply with a first assessment: what scope makes sense, how we would approach it and which documents you will need.

This website does not set cookies.

Nothing is stored in your browser. We use no analytics, tracking or marketing services and load no content, fonts or scripts from third parties.

Nothing is stored in your browser.

When any website is accessed, the web server processes technically necessary access data such as the IP address. Details are in the privacy policy.

You will find full information in our privacy policy.